Add You
#1 in Business Subscribe Email Print

You are here: Home > Computers and Technology > Hardware > Colocation Facility Cooling System Considerations

Tags

  • chiller
  • other
  • generally
  • floor facilities
  • across their
  • colocation facilities

  • Links

  • Inspirational Power ( Part 1 )
  • Aromatherapy: the Sweetest Way to Boost Fertility Naturally
  • Secrets to Good Health Unraveled
  • Add You - Colocation Facility Cooling System Considerations

    Do You Make These Ten Management Mistakes?
    As a busy executive, you face some extremely difficult challenges like creating and dominating new markets or finding and keeping the best people.  But then, like many executives, do you find yourself spending too much time solving everyday problems (that only you can solve, right?), which prevent you from growing your ideal business? Most managers find themselves spending 80% or more of their time “reacting” to business events and very little time in preventing those same events from occurring again.  If this sounds
    ancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/square foot or higher; the ratio should not be

    Career Change - Resume Problems
    What can I do about gaps in employment?There isn't much you can do about your work chronology—what's done is done. However, there are a few ways to present your work history so that the gaps are less apparent:- Consider including only years worked (rather than months and years). - Place employment dates next to job titles in parentheses. - Never showcase employment dates around large areas of white space—this draws attention to your chronology. -Think about other activities that you pursued durin
    Most companies know to find a colocation facility that has good Internet service and Internet provider and carrier options. However, cooling systems are often overlooked. Most servers now are made to operate at normal office conditions, which mean that two environmental factors should be met:
    • The temperature should stay between 72° F and 76° F
    • The humidity should be between 45% and 60%, with 45% ideal
    • Cooling units must be on continuously, so servers will not overheat (this precludes standard HVAC units).

    If the cooling system goes down, it can cause the equipment to overheat, causing the network to go down and even damaging equipment. Colocation facility cooling systems include three areas: the facility layout, chillers, and computer room air conditioning (CRAC) units.

    Facility Layout
    Servers generate heat as they run. This is generally blown out the back of the server by fans; cool air is taken in through vents at the front. Server racks and rows should be laid out to manage hot air coming from the servers and conditioned air going to their intakes by designating “hot rows,” which face the server fans, and “cold rows,” which face the intakes. Designated hot and cold rows keep air circulating in the best directions to keep servers from overheating.

    Facility Design
    There are two kinds of building design for colocation facilities: raised floor and solid floor. Raised floor was the preferred structure when servers were towers because the mesh flooring allowed air conditioned air to blow from the bottom directly across their intakes. However, since servers are stacked in racks, cold air must reach the tops of the racks to cool machines. Solid floor facilities are a better option. The facility should take into account the following:

    • Solid floor designs must have mesh front and rear doors for th server cabinets to allow hot air to escape.
    • For raised floor designs, cold air must have enough air pressure to force air to the top of the server cabinets. Ideally, special duct work will be in place to force the airflow upward.
    • For raised floors, server cabinets should not have vents in the doors that would let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/square foot or higher; the ratio should not be b

    Valid HTML code is crucial to Search Engine Optimization
    Why valid HTML code is crucial to your web site's search engine optimization efforts and subsequent high rankings:Many webmasters and newcomers to web page design overlook a crucial aspect of web site promotion: the validity of the HTML code.What is valid HTML code?Most web pages are written in HTML, and as for every language, HTML has its own grammar, vocabulary and syntax, and each document written in HTML is supposed to follow these rules.Like any language, HTML constantly chan
    he facility layout, chillers, and computer room air conditioning (CRAC) units.

    Facility Layout
    Servers generate heat as they run. This is generally blown out the back of the server by fans; cool air is taken in through vents at the front. Server racks and rows should be laid out to manage hot air coming from the servers and conditioned air going to their intakes by designating “hot rows,” which face the server fans, and “cold rows,” which face the intakes. Designated hot and cold rows keep air circulating in the best directions to keep servers from overheating.

    Facility Design
    There are two kinds of building design for colocation facilities: raised floor and solid floor. Raised floor was the preferred structure when servers were towers because the mesh flooring allowed air conditioned air to blow from the bottom directly across their intakes. However, since servers are stacked in racks, cold air must reach the tops of the racks to cool machines. Solid floor facilities are a better option. The facility should take into account the following:

    • Solid floor designs must have mesh front and rear doors for th server cabinets to allow hot air to escape.
    • For raised floor designs, cold air must have enough air pressure to force air to the top of the server cabinets. Ideally, special duct work will be in place to force the airflow upward.
    • For raised floors, server cabinets should not have vents in the doors that would let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/square foot or higher; the ratio should not be

    Outsourcing Fleet Washing Services for Pool Cars at Corporations
    Labor markets are tight in the United States and many Corporations are trying to figure out how to deal with this problem. This is one reason why Corporations, which have corporate transportation and pool cars need to consider outsourcing their vehicle maintenance and fleet washing.Pool cars need to be clean for executives to check them out and it just takes too many man-hours to run them down to the local carwash. Additionally, it costs money if they are to hire an in-house employee or have their facilities maintenan
    red structure when servers were towers because the mesh flooring allowed air conditioned air to blow from the bottom directly across their intakes. However, since servers are stacked in racks, cold air must reach the tops of the racks to cool machines. Solid floor facilities are a better option. The facility should take into account the following:
    • Solid floor designs must have mesh front and rear doors for th server cabinets to allow hot air to escape.
    • For raised floor designs, cold air must have enough air pressure to force air to the top of the server cabinets. Ideally, special duct work will be in place to force the airflow upward.
    • For raised floors, server cabinets should not have vents in the doors that would let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/square foot or higher; the ratio should not be

    Shopping eBay Stores is Easy If You Know What You Are Doing
    eBay Stores can offer the internet shopper a variety of products and selection with the ease and security of shopping on eBay. With a shopping experience similar to any shopping website domain, eBay stores can be a breeze to navigate and with Paypal checkout payment services and the option of money order payment, makes payment and shipping easy too. With easy to search listings and pay now options, these eBay Store sites have the look and feel of any online shopping website. Some eBay Stores feature one type of p
    ould let cool air escape.

    Chiller Systems
    Chillers pipe water or water/glycol coolants through the CRAC units. Chiller systems include pumps, pipes, and the chillers themselves. The following points should be considered to make sure that the system is adequate to cool the facility:

    • Sufficient capacity
    • Backup units for the pumps and chillers which switch over automatically
    • Regular maintenance

    CRAC Units
    CRAC units are massive, dedicated air conditioners which manage temperature and humidity. They have many parts and are complicated – meaning failures can be common. The CRAC units should be well maintained, but the most important thing is redundancy. Redundancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/square foot or higher; the ratio should not be

    Online Sweepstakes
    Companies make sweepstakes available to consumers by three means: direct mail, telephone and the ever growing in popularity online method.Online sweepstakes are big business and give away billions of dollars, as well as cars, jewelry, vacations, shopping sprees, and other grand items. On the flip side, one can win as little as $1. But a free dollar is a free dollar!In order to get entered in a particular sweepstakes, you may have to sign up to receive various products or services. That is how the sweepstakes pe
    ancy is determined by the overall capacity of the CRAC units; there should be enough units that even with a failure, the facility will still be adequately cooled. As with chillers, capacity for CRAC units is determined by tons per square foot.

    Verify Capacity
    Capacity is determined by the ratio of tons per square foot. To determine whether a system has sufficient capacity, divide the total tonnage of the units by the square footage of the building. If there are four 30-ton CRAC units in a 4,000 square foot facility, then the CRAC capacity is .030 tons per square foot (120 tons / 4,000 square feet). The ideal ratio of tons to square feet for the CRAC system is .030 ton/square foot or higher; the ratio should not be below .025 tons/square foot. This same formula is used for chiller systems, with the same ideal ratios.

    It is important to look for a colocation facility that has Internet provider options and backup power systems. Equally important is a facility with the right design, chillers, and CRAC units to cool the server room. Keeping equipment from overheating will keep networks up and makes equipment last longer. Like Internet connections, network uptime, and power backups, cooling systems signify a quality colocation facility.

    HTTP = HTML link (for blogs, profiles,phorums):
    <a href="http://www.addyou.info/article/174677/addyou-Colocation-Facility-Cooling-System-Considerations.html">Colocation Facility Cooling System Considerations</a>

    BB link (for phorums):
    [url=http://www.addyou.info/article/174677/addyou-Colocation-Facility-Cooling-System-Considerations.html]Colocation Facility Cooling System Considerations[/url]

    Related Articles:

    6 Ways to Improve Customer Service

    MySpace - A Place for Spamming Friends

    New Hampshire Mortgage - What to Expect When Buying a Home in New Hampshire

    Bookmark it: del.icio.us digg.com reddit.com netvouz.com google.com yahoo.com technorati.com furl.net bloglines.com socialdust.com ma.gnolia.com newsvine.com slashdot.org simpy.com shadows.com blinklist.com